- how do variations occur?
How do variations occur? |
The contract usually sets out a procedure for the issuing of instructions for variations. In practice however, contractual procedures for variations are not always followed. Disputes often arise over whether: |
|
If the principal does not follow the procedure for instructing a variation then the contractor may refuse to perform the variation. If the contractor elects to perform a variation which has been incorrectly instructed, then the principal may be entitled to refuse to pay for it under the contract. |